• Dovre Township mining project

The Dovre Township Mining Project is a welded wire wall constructed in May 2012. The projects located on County Highway AA Dovre Township, Barron County, Wisconsin. The wall was designed by Tom Jepsen, P.E., Collins Engineers, Inc and the wall was built by Highway Landscapers, Inc.

Wall Details:

  • Welded Wire Wall, 2 angle points
  • Maximum Wall Height of 36’
  • Maximum Mat Length of 26’
  • Uniform live load surcharge of 380 psf
  • 40-year design life – hot-dipped steel
  • 3,608 SF
Wall Type: 
Welded Wire Wall
Wire Type: 
Galvanized
Owner Type: 
Mining
Wall Height: 
Wall Size: 
Under 5000 SF