URS Silica Mine Crusher Wall

The URS Silica Mine Crusher Wall project is non-galvanized welded wire wall constructed in October 2015. The project is located Soda Springs, Idaho. The contactor on the project is EarthTech West Ltd and the wall designer is American Geotechnics. 

Wall Details:

•    Welded Wire Wall (one angle point)
•    Maximum Wall Height of 27’
•    Maximum Mat Length of 34’
•    35-year design life – Non-Galvanized steel
•    2,712 SF


 

Ely, Nevada Mining Project

The Ely, Nevada mining project is a hot dipped galvanized Welded Wire Wall constructed in March 2018. The project is located on State Route 892, Ely, NV 89803. The wall designer is CESaretti Engineered Solutions.

WALL GEOMETRY AND CONDITIONS:
•    Welded Wire Wall (seven angle points)
•    Maximum Wall Height of 24’
•    Maximum Mat Length of 18’
•    Loads: 350 psf (5’ Wide, 1’ from the Face of Wall)
•    Maximum ground acceleration coefficient, A=0.310
•    50-year design life – Hot Dip Galvanized
•     25,104 SF (218 AWG)
 

Gold Bar Mining Project

The Gold Bar Project is a hot dip galvanized Welded Wire Wall constructed in May 2018. The wall is located 15 miles from Eureka, Eureka County, Nevada. The designer of the wall was Jepsen Engineering.

WALL GEOMETRY:
•    Welded Wire Wall 
•    Maximum Wall Height of 26’
•    Maximum Mat Length of 20’
•    Seismic acceleration of 0.20g
•    20-year design life – Hot Dip Galvanized
•    2,688 SF
 

Sorting Facility Ramp

The Sorting Facility Ramp project is a mining project constructed in June 2018. The project is located in Montana. The maximum wall height is 28 feet and 8,440 square feet. The designer of the wall was CESaretti Engineered Solutions.

Nye, Montana Mining Project

The Nye, Montana Mining Project was constructed in September 2018. The project is located in Nye, Montana. The wall designer was CESaretti Engineered Solutions. 

WALL DETAILS:
•    Welded Wire Wall (one angle point)
•    Maximum Wall Height of 18’
•    Maximum Mat Length of 14’
•    Loads: Factor bearing load – 3,500 psf.
•    Maximum ground acceleration coefficient, A=0.150
•    75-year design life – Black Steel
•     2,592 SF (57 AWG)
 

SH 145 San Miguel County

The SH 145 San Miguel County Project is a Welded Wire Wall Constructed in 2019 in Telluride Co.  The SH 145 San Miguel County wall is owned by the Colorado Department of Transportation and was built by Telluride Gravel, Inc. The wall is 20' tall and 15,500 sf, and was designed by Yeh and Associates.

Northgate Link Extension Light Rail Project

The Northgate Link Extension Light Rail project is a Artweld Gabion-faced MSE wall with veneer Artweld Gabions in Seattle Washington.  The Northgate Link Extension Light Rail was constructed in 2018-2019 by KLB Construction Inc.  It consists of 6,250 CY of Artweld Gabion-faced MSE and 4,200 CY of veneer Artweld Gabions. The owner of the project is Sound Transit and was designed by CESaretti Engineered Solutions.

Lakewood Dam Repair

The Lakewood Dam Repair project is an ArtWeld Gabion wall.  The Lakewood Dam Repair project was constructed in 2019 by Sierra Mountain Construction Inc.  It Consists of 137 cy of Artweld Gabions and is owned by the Tuolumne Utilities District and was designed by Condor Earth Technologies, Inc.

Pages