N. Vassault Street Sidewalk Improvements

N. Vassault Street Sidewalk Improvements is a Spiralnail / Truss Panel wall constructed in 2015.  The project is located in Tacoma, WA, and consists of 3492 SF of Truss panels, 196 Spiralnails, with a max height of 12'.  The N. Vassault Street Sidewalk Improvements wall was constructed by Global Contractors, LLC, designed by Cesaretti Engineered Solutions, and is owned by the City of Tacoma Public Works Dept.

Purdy Creek Bridge Replacement

The Purdy Creek Bridge Replacement is a Welded Wire Wall located in Mason County, Washington.  The Wall was built by Quig Bros., Inc., it is 24,000 SF, and 22' tall.  The Purdy Creek Bridge Replacement is owned by the Washington State Department of Transportation, and was designed by SHN Consulting Engineers and Geologists.

 

Weihl Road Improvements

The Weihl Road Improvements project is a Welded Wire Wall located in Cle Elum, WA.  The wall was built by Granite in 2019, it is 4224 SF, and 8' tall.  The Weihl Road Improvements is owned by Kittitas County Public Works, and was designed by Cesaretti Engineered Solutions.

Albany Railroad / Golf Course Bridge

The Albany Railroad / Golf Course Bridge Project is a Trinity Wall constructed in 2008. This is a unique project which utilized Trinity Baskets to reinforce an old wood railroad support.  Building the Trinity Baskets around the existing railroad tresses allowed the train to continue to operate during construction.  This project  is located in Linn County, OR, it consists of 2350 cy of Trinity baskets, and was built by Willamette & Pacific Railroad.

Pages